Newcastle Station
Newcastle station required extensive work to refurbish its barrel roof. A key condition was that the station remained fully operational whilst the work was carried out. Spencer Group was awarded the 52-week contract on the strength of our strong history of providing innovative engineering solutions which minimise impact on the everyday running of railway infrastructure.
Client
Network Rail
Duration
12 months
Location
Newcastle
KEY STATISTICS
100%
Safety Record
Grade 1
Listed Building
3
Roofs Refurbished
PROJECT SCOPE
The main scope of the works involved the refurbishment of the three ‘Dobson’ Barrel Roofs. This included:
• re-waterproofing the entire structure
• adding new clerestory glazing, and installing new lantern capping and new ‘over barrel’ stairways
• adding decorative internal cladding to the barrel vault roofs
• strengthening the arch ribs
Additionally, Spencer Group also:
• installed new lighting
• installed new mains distribution throughout the station
• refurbished the entire drainage system
• added new copings and paving to a number of the main platforms.