Penzance Depot
Great Western Railway is looking to improve its service with a new £20million depot at Long Rock in Penzance. Through a strong collaborative working relationship between Spencer Rail Engineering, GWR and the Depot team, the project was completed to the accelerated programme with zero impact to depot operations.
Spencer Rail Engineering took two projects – the construction of a new Train Care Depot and the refurbishment of an existing High-Speed Train shed – and designed a solution to construct one facility, incorporating the old shed within the new building using an innovative envelope and cantilever steelwork design.
We constructed a slightly taller portal frame shed, designed to enable installation of the new building’s roof sheeting with the original shed untouched below. We used a moveable encapsulation shield to remove the old High-Speed Train shed asbestos roof/wall sheeting, maintaining the 24hour operational requirements of the depot while ensuring the asbestos was contained. We then removed the structural steel rafters from the old shed, painted old steel to remain, and connected the old shed columns to the new shed cantilevered portal rafters.