Hackney Station

An estimated 165,000 people took the street level transfer between Hackney Downs and Hackney Central Stations each year, and with an extra 150,000 passengers expected when Hackney Downs joined the London Overground Network. Transport for London awarded Spencer Group the design and build of a walkway between both stations to ease congestion, improve access to the station and enhance passenger experience. and allow step free disabled access between the two.

Client
Transport for London
Duration
14 months
Location
Inner London
KEY STATISTICS
165,000
Footbridge Crossing Per Year
150M
Walkway Connecting Two Stations
1
Children's Play Park Created
PROJECT SCOPE

The walkway designed and built by Spencer Group was a multi-span elevated 150m steel walkway, with supporting columns on piled bases. To facilitate this, temporary works for the installations of truss spliced sections were required. Additionally, Spencer Group fitted a new lift, power supply and associated mechanical services, alongside lighting and SISS installation (including CCTV, comms, PA etc.). Electrical earthing and bonding was carried out by Spencer Group in addition to adjustments to the existing OLE return conductor. We also landscaped and rejuvenated the local realm, involving the relocation and installation of a brand new children’s play park and the installation of new stairs. with ‘fit out’ of M&E, PA and passenger information displays.

Have a project you want to discuss?

We work closely with clients from the outset to shape practical, deliverable rail solutions, bringing early contractor involvement, technical expertise and real-world experience into every conversation. Get in touch to discuss your project and explore how early collaboration can reduce risk, improve outcomes and deliver long-term value.

PROJECT OUTCOME

Spencer Group engaged proactively with stakeholders to ensure they were kept informed throughout the life of the project. Site access and craneage required the relocation of the residents’ original children’s play area. We held a meeting with residents and families who used the playground, working collaboratively with them to relocate the facility to the best possible outcome. The Tenants Residents Association praised Spencer Group for our consideration and assistance throughout, including the furnishing of the playpark with the latest equipment free of charge as a thank you for locals continued patience as the project progressed. This much-appreciated approach enabled commuters to use the footbridge as quickly as possible.