The project to improve Edinburgh’s historic Waverley Station had an extensive scope and was therefore split into four packages. Package 4 involved the repair and rationalisation of services in the main building and operation building, coupled with resurfacing the main building’s internal concourse. Spencer Group also completed the Package 3 works at the station.
The works to the station mainly comprised the station building roof repair works (including glazing above the ticket hall). This involved the removal of redundant elements on the roof and the renewal and repair of roof drainage systems. Spencer Group also carried out a series of other major works, including:
• the provision of an external lift and link bridge to the operations centre building
• the installation of a new passenger lift in the main station building
• the reconfiguration of the Calton Road car park entrance
• the strengthening of the existing Calton Road bridge
• the renewal of services infrastructure, including distribution switchboards
• the cleaning and repair of stonework, woodwork and decorative metalwork in the ticket hall of the main station