Wessex Package 7
Wessex Package 7 increased platform length at 50 station sites along the Wessex rail route. It formed part of the wider train lengthening programme, allowing the operation of longer trains in key parts of the south east. Spencer Rail Engineering collaborated with major supply chain partners to develop an innovative bespoke platform design to meet the demands of restructure track access.
Client
Network Rail
Duration
45 months
Location
West of England
KEY STATISTICS
57
Station Locations
>2500M
of Platform Construction
39
New Signals Installed
PROJECT SCOPE
The project required design and build services, involving platform extensions, associated infrastructure, p-way, S&T, power and signals at each of 50 individual stations (57 station locations in total), with the associated infrastructure being repositioned and commissioned to support the platform construction works.
To enable the swift construction of platforms we used innovative construction methodology, where all components for the platforms were carried into position manually. This mitigated the requirements for heavy plant and reducing the wet trades. This was achieved by using minipiles, steel frame and GRP decking, which all but negated the impact of construction on any other element of the scheme.
CAPABILITIES