Aldwarke Bridge

The Aldwarke North Bridge spans the Sheffield to Rotherham railway line and links the north west of TATA Steel’s Aldwarke site to the road network. Erected in 1963, the bridge required extensive maintenance of its paintwork to remain structurally sound and operational, as well as the removal and replacement of its existing coats of lead-based paint with a modern alternative.

Client
TATA Steel
Duration
13 months
Location
Rotherham, South Yorkshire
KEY STATISTICS
50
Year-Old Bridge
0
Accidents
3
Coats of Paint
PROJECT SCOPE

The work required the Aldwarke North Bridge to be completely refurbished, including the cleaning, structural and steel paint repairs and the repainting of the remainder of the bridge. The works required scaffolding to fully encapsulate the bridge on its under-slaw due to the painting and blasting of existing lead based paint that coated the entirety of the structure. The outdated lead paint was to be replaced with a modern 3 coat system that would greatly improve its resistance to weather and pollution, as well as reduce the need for further maintenance. Works also included removal of redundant services and working over live Network Rail lines, so maximum efficiency and safety during the works were of paramount importance.

Have a project you want to discuss?

We work closely with clients from the outset to shape practical, deliverable rail solutions, bringing early contractor involvement, technical expertise and real-world experience into every conversation. Get in touch to discuss your project and explore how early collaboration can reduce risk, improve outcomes and deliver long-term value.

PROJECT OUTCOME

Using our expertise in working with live sites in the rail sector, Spencer was well placed to carry out these works to the maximum safety and efficiency standards, working closely with both the client and Network Rail to ensure minimum disruption to the work of both parties. Our in-house design team created a complex scaffolding system to encapsulate the bridge without hampering the live track beneath, and the whole project was carried out with zero accidents. The outcome of the refurbishment of the bridge included a smart and aesthetically pleasing design whilst ensuring the bridge’s structural integrity, which left our client extremely happy with the end result.