In 2012 Siemens obtained a contract to build and maintain 20 Desiro Class 350 electric multiple units for First TransPennine Express. The project required the modification of Ardwick Depot to facilitate the Class 350 units, while retaining the capability to service and maintain the existing Class 185 fleet, and subsequent 25kV electrification of the site including new OLE.

Client
Siemens
Duration
11 months
Location
Manchester
KEY STATISTICS
61
Trans Maintained at the Depot
9
Roads to Keep Open
40
New Carriages in the Service Following Upgrade
PROJECT SCOPE

Spencer Rail Engineering was required to modify the depot while retaining the capability to service and maintain the existing Class 185 fleet. The main bulk of the work was to the depot power supply, where Spencer carried out the 25Kv electrification of the Ardwick site including new substation and OLE. We also extended the facility via the extension of the Maintenance Facility Building to accommodate the longer 4-car Class 350 Units, and carried out ancillary works in the form of additional works to maintain and service the new EMUs, in accordance with Siemens maintenance requirements, and created new internal building secondary steelwork and flooring at mezzanine level access. We extended the CET and fuelling facility, apron slabs and modified the equipment for the longer trains. We also installed new shore supplies.

Have a project you want to discuss?

We work closely with clients from the outset to shape practical, deliverable rail solutions, bringing early contractor involvement, technical expertise and real-world experience into every conversation. Get in touch to discuss your project and explore how early collaboration can reduce risk, improve outcomes and deliver long-term value.

PROJECT OUTCOME

In spite of the tight deadline of less than a year, Spencer Rail Engineering maintained our usual exemplary quality standards of work. The project was carried out, as usual, with the highest regard for the safety and security of works and civilians, and feedback from the client was extremely positive. The depot and maintenance shed remained operational throughout the works, demonstrating full collaboration at its best between Siemens and Spencer Rail Engineering. Once completed, the depot upgrade was ceremonially opened by Lucy Powell (MP) on 27th September 2013, with the first of the class 350/4 trains arriving at the depot on 28th November 2013.