Ipswich Chord Bridge 404

The Ipswich Chord is a new 1.2km double track railway providing essential connection between the East Suffolk Line and the Great Eastern Line. The Chord forms part of the strategic freight network between Ipswich and Peterborough. Spencer Rail Engineering was commissioned by Network Rail for the design and construction phase of the project.

Client
Network Rail
Duration
21 months
Location
Ipswich, Suffolk
KEY STATISTICS
4
New Bridges
413M
Retaining Wall
2
New Embankments
PROJECT SCOPE

The team was faced with access difficulties to a site hemmed in by rail , river and urban development; and in successfully gaining the support of local landowners and users for the permanent and temporary work. Working alongside a live railway required a significant disruptive possession regime including a 5-day blockade over Christmas 2013. This required an intricate plan of staged construction and testing to maintain operational performance without comprising site safety. Spencer Rail Engineering enjoyed a full collaborative relationship with Network Rail and also formed an effective alliance with lead designer, Arup. This created an ideal platform for finding joint solutions to problems on-site, resolving commercial issues and managing risk.

Have a project you want to discuss?

We work closely with clients from the outset to shape practical, deliverable rail solutions, bringing early contractor involvement, technical expertise and real-world experience into every conversation. Get in touch to discuss your project and explore how early collaboration can reduce risk, improve outcomes and deliver long-term value.

PROJECT OUTCOME

Bridge 404, a two-track rail over water bridge was replaced during the Christmas blockade, one of four bridges in this project. This was achieved in just 52 hours through use of precast units.
Despite the extreme complexities of the project and some of the worst winter storms on record, the work was completed on time and to budget with no complaints. The Ipswich Chord will cut journey times by at least 30 minutes and the increased capacity on the railway will mean 750,00 fewer lorries on the road. This will be huge relief for commuters on the congested A14 and will make a significant contribution to meeting carbon reduction targets.