Kirkstall Forge
Kirkstall Forge Station, Bradford, was part of the wider West Yorkshire Rail Growth Package, an integrated package of rail enhancements in the Leeds City Region. Kirkstall Forge was one of two brand new stations Spencer Rail Engineering built on the Bradford Forster Square – Leeds route. Apperley Bridge, the other station, was built and commissioned by Spencer Rail Engineering 7 months earlier.
Client
Network Rail
Duration
16 months
Location
Bradford
KEY STATISTICS
2
Lifts Installed
0
Accidents During the Project
62,000
Man Hours Worked in Total
PROJECT SCOPE
The full scope of works involved the design and build of a brand new station, incorporating the following:
• A new access road off Abbey Road, A65
• A pick-up and drop-off point for cars and buses
• A 200 space car park
• 2 passenger platforms, new OLE structures, under track duct
• Artisan AFA overbridge with lifts and staircases
• CCTV and public address system
• Passenger information displays
• Bicycle parking and shelters
• Ramp facilities throughout