Rochester Medway
Spencer won the design-and-build contract to build a 300-space car park adjacent to the new Rochester Station in June 2015. We were already on site constructing the new station for Network Rail and so were well-placed to assist the council’s plans for the new car park facility, utilising our civil engineering expertise to supplement the ongoing rail project and demonstrate our flexibility.
Client
Medway Council
Duration
7 months
Location
Rochester
KEY STATISTICS
327
Parking Spaces Created
0
Dangerous Occurrences Reported
1,700㎡
of Gold Cladding Used on the Exterior of the Car Park
PROJECT SCOPE
Spencer’s aim for the project was to make the completed building accessible to people of all ages and abilities, and the installation of two lifts has helped to achieve this. The building is 90m long, 30m wide and up to 10m high, allowing for a coherent layout and clutter-free design. Spencer’s designers co-ordinated design input from a number of external consultants and specialist contractors, including an award-winning architect who produced the initial concept design. Work started on site in June 2015 with the diversion of services and in September, 150 continuous-flight-auger piles were installed by Spencer’s supply partner, Bachy Soletanche. The project was completed in time for the ‘Sweeps’ Festival, an important client objective.
CAPABILITIES