Waverley Package 3
This capacity expansion project at Edinburgh Waverley station, requiring the preservation of the station’s Victorian heritage, was split into four packages. Spencer Group was commissioned for packages 3 and 4. Package 3 concerned the southern part of the station, separated from the rest by the Klondike wall.
The project involved the removal and replacement of a major footbridge, demolishing existing buildings on two platforms, replacing a number of staircases, installing new lift shafts and lifts, replacing canopy roof cladding, repairs to historically important walls, and a wide range of paving, resurfacing, recladding and painting work. The Spencer Group team successfully removed the canopies over Platforms 8 & 9. This involved carefully preserving the historic steelwork columns and supports, blasting and painting the structure and installing new roof steelwork and glass coverings. The roof is limited to 12.8m above rail level by statute and the station has listed building status, so precision engineering and an eye for detail were crucial throughout the works.